• last updated 5 hours ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
strengthen boolean parameters in page contracts

  1. … 6 more files in changeset.
merged changes from the oacs-5-9 branch and resolved conflicts

  1. … 7834 more files in changeset.
- add editor hints to keep spaces/tabs in the future more consistent

  1. … 217 more files in changeset.
- use type checking for boolean parameters in page_contracts to improve security

  1. … 20 more files in changeset.
Merging back to HEAD branch oacs-5-8 (using tag vg-merge-oacs-5-8-from-20141027).

  1. … 2547 more files in changeset.
- improve page contracts

  1. … 11 more files in changeset.
- improve page contracts (use right type for IDs)

  1. … 11 more files in changeset.
- use Tcl 8.5 idioms (range expressions, lindex with multiple indices)

- remove deprecated calls (ad_require_permission, ad_parameter)

  1. … 12 more files in changeset.
- modernize Tcl (use byte-compiled comparisons, don't use numeric comparisons for string expressions, brace expressions)

  1. … 15 more files in changeset.
commit to HEAD of merge of changes on oacs-5-1 branch between tags jcd-merge-5-1-20040724 and jcd-merge-5-1-20050111

  1. … 2275 more files in changeset.
Fixing name/title issues resulting from recent changes to file-storage, and also a few smaller bugs.

  1. … 17 more files in changeset.
merge all the changes on the oacs-5-1 and dotlrn-2-0 branches up to tag jcd-merge-20040420

  1. … 647 more files in changeset.
fix context bar i18n error

  1. … 8 more files in changeset.
i18nized dotLRN Homework

  1. … 28 more files in changeset.
Fixed bugs. Ported to Postgres.

  1. … 25 more files in changeset.
Adding dotlrn-homework package for Oracle only.

  1. … 69 more files in changeset.
Initial revision

  1. … 69 more files in changeset.