• last updated 14 hours ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
improve tailorability by separating name of event and time span

  1. … 4 more files in changeset.
Merged the 5.4 branch to HEAD, to pick up emmanuelle's fixes before I go

off fixing a bunch of other stuff.

  1. … 27 more files in changeset.
Removed event handler for onMouseOver and onMouseOut event

  1. … 1 more file in changeset.
HTML Strict cleanup

  1. … 2 more files in changeset.
Replace header_stuff property with calls to template::head

  1. … 11 more files in changeset.
Merged oacs-5-3 branch to HEAD

  1. … 187 more files in changeset.
changing <br/> to <br> to meet html transitional validation requirements

  1. … 3 more files in changeset.
Merged changes to HEAD ...

  1. … 1556 more files in changeset.
Merging dotlrn-all and dotlrn-extras from oacs-5-2

  1. … 882 more files in changeset.
Merge return_url and ui cleanup frm 5.2 (sorry! accidentally commited new code to 5.2 first)

  1. … 14 more files in changeset.
First shot at merging oacs-5-2 apps used in .LRN to HEAD.

  1. … 2478 more files in changeset.
Removed add image

1325. Parameterize show calendar name

Added a paramter Show_Calendar_Name_p and fixed the view*adp's so that

they pay respect to this parameter.

  1. … 3 more files in changeset.
A few more CSS modifications

Slimmed down the CSS file considerably

Removed markup from the view pages

Unified multirow names

Unified sql queries

Use partialqueries more consistently

(These changes should be backwards-compatible with .LRN 2.0 and .LRN

head. Testing needs to be done here, fixing will take place during the

feature freeze period)

  1. … 10 more files in changeset.
merge of changes on oacs-5-0 branch to oacs-5-0-0b4 tag

  1. … 598 more files in changeset.
Fixed bug #482: URLs for gifs wrong

  1. … 11 more files in changeset.
Make calendar play nice with calendar-portlets. I am slowly approaching alpha status with this.

  1. … 20 more files in changeset.
Fixed stylesheet problem: Calendar's stylesheet redefined the entire site's CSS

- moved stylesheet to www/resrouces

  1. … 12 more files in changeset.
Bring back url_stub_callback, day_template, item_template

  1. … 8 more files in changeset.
noquote fixes: moved as much html generation into adp files

  1. … 42 more files in changeset.
draft version of noquoted calendar package

    • -0
    • +1
    ./view-week-display.adp
  1. … 22 more files in changeset.