• last updated 4 hours ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
Bump version to 2.16b2. Add a pm::status::default_open proc.

Fix appearance of email notifications. Old description is now no longer in h4

Fixes bug where tasks aren't assigned deadlines.

Fixes a bug when urls are constructed from within another package.

Also fixes the links in daily reminder emails.

file calendar-users-update.tcl was initially added on branch oacs-5-1.

    • -0
    • +0
    ./www/calendar-users-update.tcl
Adding in files left out from last commit.

    • -0
    • +22
    ./sql/postgresql/upgrade/upgrade-2.15b4-2.16b1.sql
file upgrade-2.15b4-2.16b1.sql was initially added on branch oacs-5-1.

    • -0
    • +0
    ./sql/postgresql/upgrade/upgrade-2.15b4-2.16b1.sql
Release of 2.16b1 of project manager: features an improved task calendar

and better daily reminders. More HTML email.

Close tag in email sent out when tasks are closed.

Fix bug where hours logged to a task wouldn't show up if the default

logger variable (hours2) for a project was not the same as the default

variable (hours).

Fix bug in pm::task::close that prevented notifications from going out.

Adds in HTML email notifications. Note: requires bug fix in

acs-tcl/tcl/html-email-procs.tcl (copy from head of oacs-5-1)

Fixes bug which prevents daily reminder emails from going out

closed to Closed.

Simplify the email notifications.

Add option to edit tasks en masse from tasks page.

Fixes bug that prevented display of all tasks on calendar

Bump version number to require new logger version (so parameter changes

are reflected without error).

Fix to bug introduced by Malte's parameter name change.

Hide tasks by default, show roles in calendar, show key

    • -42
    • +46
    ./tcl/calendar-procs-postgresql.xql
Changed switches to more appropriate naming estimated_hours

Fix bug 2073: comments were not displayed in notifications when the task was

being closed. Bump version up to 2.15b3. Also, minor color change for task

calendar.

Fixes bug in sorting, which allows tasks to appear on right day on calendar.

Introduce the calendar to the UI. Improve the appearance of the task

calendar. Bump to version 2.15b1

    • -10
    • +0
    ./www/task-assign-add-edit-postgresql.xql
Improved calendar (still not visible in UI, however). Bumped version

number to 2.14

Adds in a primitive calendar to view tasks. Not linked in in any way, however.

    • -0
    • +52
    ./tcl/calendar-procs-postgresql.xql
file calendar-procs-postgresql.xql was initially added on branch oacs-5-1.

    • -0
    • +0
    ./tcl/calendar-procs-postgresql.xql
file task-calendar.tcl was initially added on branch oacs-5-1.

    • -0
    • +0
    ./www/task-calendar.tcl
file task-calendar.adp was initially added on branch oacs-5-1.

    • -0
    • +0
    ./www/task-calendar.adp
file calendar-procs.tcl was initially added on branch oacs-5-1.

    • -0
    • +0
    ./tcl/calendar-procs.tcl